Electrical fitting work (№14837446)

23 may

Number: 14837446

Country: Germany

Source: TED


Link to original

To view links to the source need to register

Publication date


23-05-2019

Description


  1. Section I
    1. Name and addresses
      Stadt Rosenheim
      Königstraße 24
      Rosenheim
      83022
      Germany
      E-mail: [email protected]
    2. Type of the contracting authority:
      Regional or local authority
    3. Main activity:
      General public services
  2. Section II
    1. Scope of the procurement:
      1. Title:

        4001 Elektroinstallation, Bauteil 2 Haus A DIN 0100, 0800, 14675

        Reference number: 0311
      2. Main CPV code:
        45311200
      3. Type of contract:
        Works
      4. Short description:

        4001 Elektroinstallation, Bauteil 2 Haus A DIN 0100, 0800, 14675.

      5. Information about lots:
        This contract is divided into lots: no
      6. Total value of the procurement:
        Value excluding VAT: 619 949.50 EUR
    2. Description
      1. Title:
      2. Additional CPV code(s):

      3. Place of performance:
        Main site or place of performance:

        83022 Rosenheim

      4. Description of the procurement:

        4001 Elektroinstallation, Bauteil 2 Haus A DIN 0100, 0800, 14675.

      5. Award criteria:
      6. Information about options:
        Options: no
      7. Information about European Union funds:
        The procurement is related to a project and/or programme financed by European Union funds: no
      8. Additional information:
  3. Section IV
    1. Description:
      1. Type of procedure:
      2. Information about a framework agreement or a dynamic purchasing system:
      3. Information about electronic auction:
      4. Information about the Government Procurement Agreement (GPA):
        The procurement is covered by the Government Procurement Agreement: yes
    2. Administrative information:
      1. Previous publication concerning this procedure:
      2. Information about termination of dynamic purchasing system:
      3. Information about termination of call for competition in the form of a prior information notice:
  4. Section V
    1. Contract No: 0311
      Title:

      Elektroinstallation, Bauteil 2 Haus A, DIN 0100, 0800, 14675; Wartungsvertrag

    2. Award of contract
      1. Date of conclusion of the contract: 2019-03-11
      2. Information about tenders:
        Number of tenders received: 1
        Number of tenders received from SMEs: 1
        The contract has been awarded to a group of economic operators: no
      3. Name and address of the contractor:
        Elektro Maier GmbH
        Hauptstrasse 27
        Kirchweidach
        84558
        Germany
        The contractor is an SME: yes
      4. Information on value of the contract/lot (excluding VAT):

        Total value of the contract/lot: 619 949.50 EUR
      5. Information about subcontracting:

  5. Section VI
    1. Additional information
    2. Procedures for review
      1. Review body
        Vergabekammer Südbayern
        München
        80534
        Germany
        Telephone: +49 892176-2411
        Fax: +49 892176-2847
      2. Body responsible for mediation procedures

      3. Service from which information about the review procedure may be obtained

        Die Unwirksamkeit eines Vertrages nach § 135 Abs. 1 GWB kann nach § 135 Abs. 2 GWB nur festgestellt werden, wenn sie im Nachprüfungsverfahren innerhalb von 30 Kalendertagen nach der Information der betroffenen Bieter und Bewerber durch den öffentlichen Auftraggeber über den Abschluss des Vertrags, jedoch nicht später als sechs Monate nach Vertragsschluss geltend gemacht worden ist. Daneben endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung dieser Bekanntmachung im Amtsblatt der Europäischen Union.

        Stadt Rosenheim/Vergabeverfahrensstelle
        Königstraße 24
        Rosenheim
        83022
        Germany
        Telephone: +49 80313658302
        Fax: +49 80313658898310
    3. Date of dispatch of this notice
      2019-05-20